Production process

PRODUCTION PROCESS

STEP 1 Former

Continuous casting aluminum rod

Upward vertical continuous casting copper rod

STEP 2 Inspection

Drawing wire

STEP 3 Inspection

Stranding conductor

STEP 4 Inspection

Extruding insulation

STEP 5 Inspection

Assembling cores

STEP 6 Inspection

Extruding Inner sheath

STEP 7 Inspection

Armoring

Armoring protects the cable against mechanical damage using non-magnetic metallic material such as aluminum tape or wire. Magnetic material as steel tape, steel wire are not applicable

STEP 8 Inspection

Extruding outer sheath

STEP 9 Inspection

Test on final product

Strict testing is necessary before the products are launched into the market to guarantee their quality and safety. Those items not meeting the standards will be eliminated.